Design Build
|
I-85 Charlotte, NC
The Project involves widening of I-85 from south of the US 29/NC 49 Connector in Mecklenburg County to Speedway/Concord Mills Boulevard in Cabarrus County.
Keyhole Hardstand Expansion Project
Prime contractor for Design-Build demolition of existing keyhole hardstands and construction of a new 590 meter long by 110 meter wide concrete holding apron. Lane performed all demolition, grading, storm drainage, and concrete paving. LPA performed all design work under subcontract to Lane.
I-4 (SR 400) Widening, Polk County
This is a design/build project to Widening Interstate 4 (SR 400) from 4 lanes to 6 lanes with 10 ft paved shoulders for 16 miles from mile post 32 to mile post 48.
Knightdale Bypass
Joint Venture Partner for the complete design and construction of a new 15.51 kilometer limited access highway with 22 bridge structures, grading, drainage, erosion control, paving and relocation of utilities.
Design-Build Primary Runway Reconstruction
Prime contractor for Design-Build demolition and reconstruction of existing 10,100 ft. concrete runway with bituminous shoulders. Demolition of 96,000 square yards of existing concrete and bituminous pavements and reconstruction with new 14" thick,10 1/2" and 11 1/2" thick concrete runway and keel sections with new 62.5' wide asphalt shoulders including underdrain and pavement grooving and marking.
|
 |
|
Heavy Civil
|
|
 |
|
Airport
|
Ramp C and Taxiway Relocation RDU Airport, NC
This project is being built under a three phase 22 month construction schedule and will involve working within the active AOA.
Runway 12-30 Reconstruction Dulles Airport, VA
Prime Contractor for the fast-track reconstruction of Runway 12-30, the only east/west runway at Washington Dulles International Airport in a time allotment of 134 calendar days.
5th Runway Construction Hartsfield Atlanta Airport, GA
The Atlanta International Airport paving project is scheduled to commence on March 1, 2005. The project is valued at over $61,852,000 and will be constructed over a 13 month period.
Runway Reconstruction Memphis International Airport
Prime Contractor for the complete reconstruction of Runway 18R-36L including the removal and on site crushing of existing materials for use as sub-base prior to the placement of a new 19" thick concrete pavement.
Bradley International Airport
Prime Contractor for the construction of a new glycol deicing facility including excavation, embankment, drainage facilities, glycol pumping station and tanks and a new 20,000 SY concrete apron for remote deicing of commercial aircraft. Additionally, under a separate contract, Lane is performing various sitework and ancillary concrete work at the new East Concourse Terminal.
Sabre Heliport Improvement Project
Prime Contractor for a new heliport runway and taxiway system including grading and drainage at Ft. Campbell Army Base in Tennessee.
Ronald Reagan Washington National Airport
Complete demolition and reconstruction of an existing concrete apron for the newly constructed and renamed Ronald Reagan Washington National Airport.
Stafford Regional Airport - Phase IV
Prime contractor for the construction of a new airport, including the runway, taxiway, apron and landside developments in Stafford County, Virginia.
|
 |
|
Highway and Bridge
|
Reconstruction of Pennsylvania Avenue, Washington, D.C.
Under a two step RFQ/RFP process for the "Best Value" selection method of contracting, The Lane Construction Corporation was short-listed to bid on this high security project to completely reconstruct Pennsylvania Avenue between 15th Street and 17th Street directly north of the White House.
Bartow East and Bartow West Florida Projects
Prime Contractor for the Construction of 2.3 miles of reconstruction of existing lanes and addition of new lanes to upgrade from an existing two lane road to a four lane divided highway on the SR 60A bypass.
Reconstruction of Interstate 35, Hill County, Texas
Prime Contractor on two separate contracts for the reconstruction of Interstate 35 and Frontage roads in Hill County, Texas.
Interstate 85 Median Widening and Reconstruction
Prime Contractor for the construction of 16.8 miles of median widening on Interstate I-85 from four lanes to six lanes in each direction including jacking existing bridges and the construction of two new bridge structures.
Horry County South Carolina Reconstruction of Route 501
Prime Contractor for the construction of 2.2 miles of a five lane Frontage Road System including retaining walls and eight bridges along busy Rte 501 in Myrtle Beach, South Carolina
North Wake Expressway I-540, Wake County, North Carolina
Prime Contractor for two consecutive sections of the new I-540 Outer Loop Beltway for NCDOT in Wake County, NC.
State Route 22 Reconstruction, Allentown, Pennsylvania
Prime Contractor for the reconstruction of nine miles of existing four-lane, limited access highway including demolition and reconstruction of seven bridge structures under staged traffic patterns.
|
 |
|
Mass Transit
|
Blue Line Extension to Largo Addison Route, Section G4b, Largo, Maryland
Joint Venture Managing Partner for the complete design and construction of a 3.1 mile mass transit cut & cover line and aerial structures in suburban Washington, D.C. The Lane Construction Corporation is serving as Prime Contractor performing the work.
New York Avenue Station
The Washington Metropolitan Area Transit Authority awarded a $70 million Design-Build contract to the joint venture team of Slattery Skanska and The Lane Construction Corporation for the complete design and construction of a new "infill" passenger station built on the operating Red Line between Union Station and Rhode Island Avenue Station.
Dallas Area Transit Line and Station Construction
Prime Contractor for the new alignment of a mass transit line with four bridges and one at grade passenger station through suburban Dallas, Texas.
Naylor Road Mass Transit Aerial Line and Station
Prime Contractor for the new alignment of a mass transit line and elevated station construction through National Park Service Lands and private right-of-way. |
 |
|
 |
 |
|
|