The Lane Construction Corporation
The Lane Construction Corporation
Menu
  • Employees
  • Partners
  • Investors
  • Who We Are
    • Who We Are
    • Mission & Values
    • The Brands
    • Facts & Figures
    • Company History
    • Leadership
    • Why Lane?
      • Safety
      • Ethics
      • Environmental
      • Quality
      • Self Performance
      • Community Outreach
  • What We Do
    • New Contracts
    • Highways & Bridges
    • Rail, Metro & Mass Transit
    • Tunneling
    • Civil & Industrial Buildings, Airports
    • Power & Energy, Locks & Dams
  • Portfolio
  • Work With Us
    • Professional Careers
    • Craft Trades
    • Graduates & Students
    • Subcontractors/Suppliers
    • P3/Joint Venture Partnering
  • Media
    • Press Releases
    • External News
    • Publications
    • Digital Magazine
    • Social Media
    • Gallery
    • Contact
  • Contact Us
Home » Portfolio » Alexandria Bus Rapid Transit

Alexandria Bus Rapid Transit

Location: Alexandria, VA
Owner: City of Alexandria, VA
Construction Cost: $12.7 million

 

Back to
Portfolio

Project Type: Rail, Metro & Mass Transit |  Procurement Type: Design-Build
State: Virginia  |  Status: Completed

 

Lane is part of a design-build team for the construction of 0.8 miles of “Bus Only” concrete travel lanes in the existing median of Jefferson Davis Highway (Route 1) in Alexandria, VA. 

Photo Credit: John Fuller/Fullertography
Photo Credit: John Fuller/Fullertography
Photo Credit: John Fuller/Fullertography
Photo Credit: John Fuller/Fullertography
Photo Credit: John Fuller/Fullertography
Photo Credit: John Fuller/Fullertography
Photo Credit: John Fuller/Fullertography
Photo Credit: John Fuller/Fullertography

Lane led a best-value design-build team that successfully constructed the Washington, DC region’s very first bus rapid transit (BRT) line. Jointly conceived by the City of Alexandria and Arlington County, and operated by Metro, the BRT line runs along the busy Route 1 corridor between the Braddock Road and Crystal City Metro stations. The new service, called the Metroway, features higher-capacity buses running more frequently, including late at night and on weekends, in dedicated lanes separated from other traffic by medians or striping. One third of the project was funded by a Transportation Investment Generating Economic Recovery (TIGER) grant.

Work on this project included the placement of concrete pavement, as well as concrete curb and gutter, in the median of Route 1 for nearly one mile of the corridor. Other aspects of the project included the construction of seven bus shelters, excavation, hazardous materials identification and remediation, drainage system installation and retrofitting, landscaping with soil amendments, a new street lighting system, and reconfiguration of the traffic signal system to accommodate the BRT lanes.

The Lane Construction Corporation

Corporate Office

90 Fieldstone Court
Cheshire, CT 06410

Phone (203) 235-3351
Fax (203) 237-4260

Search Lane

Connect with Lane

Twitter LinkedIn Youtube Facebook Instagram

Salini ImpregiloThe Lane Construction Corporation is a wholly owned subsidiary of Lane Industries, Inc., which is a wholly owned subsidiary of Salini Impregilo U.S. Holdings, Inc.

© 2021 The Lane Construction Corporation. All Rights Reserved. Lane is an Equal Opportunity Employer M/F/D/V.

  • Privacy/CCPA Statement
  • Contact Us
Powered by SoSimpleCMS

Brief information on how we use cookies

The site uses technologies such as cookies, including ones from third parties, to personalize content and advertising to analyze website traffic. We also share information on how you use the site, with our trusted partners, operating in the social media, advertising and statistical data sectors. By closing this banner, continuing to browse this page or clicking any of its elements, such as a link or button, you declare that you accept the use of cookies, including third-party analytical cookies. To learn more or deny consent to all or some cookies, please click on the settings.

I Agree Settings

Change Cookie Settings

Save Settings Reject Changes

Required Cookies

These cookies are required to use the key functions of this website. These cookies are used exclusively by the Company and are therefore first party cookies. They are saved on the User's computer only during the current browser session.

The technical cookies also include those used to statistically analyze accesses or visits to the Site, also known as "analytics", which exclusively pursue statistical purposes (but not marketing or profiling) and collect information in the form aggregated without the possibility of tracing the identification of the individual user.

Session Cookie
User session id management - used for tracking your cookie preference. (30 day storage)

Third party cookies

During navigation, the User may also receive cookies from different sites or web servers on his terminal. This happens because the Site may contain elements such as, for example, images, maps, sounds, specific links to web pages of other domains that reside on servers other than the one on which the requested page is located.

Google Analytics
Tracking for advertising purposes.

Privacy Policy