The Lane Construction Corporation
The Lane Construction Corporation
Menu
  • Employees
  • Partners
  • Investors
  • Who We Are
    • Who We Are
    • Mission & Values
    • The Brands
    • Facts & Figures
    • Company History
    • Leadership
    • Why Lane?
      • Safety
      • Ethics
      • Environmental
      • Quality
      • Self Performance
      • Community Outreach
  • What We Do
    • New Contracts
    • Highways & Bridges
    • Rail, Metro & Mass Transit
    • Tunneling
    • Civil & Industrial Buildings, Airports
    • Power & Energy, Locks & Dams
  • Portfolio
  • Work With Us
    • Professional Careers
    • Craft Trades
    • Graduates & Students
    • Subcontractors
    • P3/Joint Venture Partnering
  • Media
    • Press Releases
    • External News
    • Toscanini
    • Publications
    • Digital Magazine
    • Social Media
    • Gallery
    • Contact
  • Contact Us
Home » Portfolio » Dugway Storage Tunnel

Dugway Storage Tunnel, OH

Owner: Northeast Ohio Regional Sewer District
Location: Cleveland, OH
Project Cost: $153 million

 

Back to
Portfolio

Project Type: Tunneling |  Procurement Type: Design-Build
State: Ohio |  Status: Ongoing

The Northeast Ohio Regional Sewer District and the Environmental Protection Agency negotiated an overall program to reduce raw sewage discharges to the environment. The project is part of a broader plan for the collection, storage, and treatment of these waters, with the objective of reducing the level of environmental pollution in Lake Erie.

Known as a consent decree, the agreement outlines specific projects and milestones that will reduce those discharges from 4.5 billion gallons (annually to 494 million gallons during an overall period of 25 years.)

Several tunnels, ranging from 2 to 5 miles in length, up to 300 feet underground, and up to 24 feet in diameter, are part of this program. There are 5 remaining tunnel projects: the Dugway Storage Tunnel, Shoreline Tunnel, Southerly Tunnel, Big Creek Tunnel, and the Westerly Tunnel.

The Dugway Storage Tunnel is a combined sewer overflow deep tunnel project that will provide additional storage of combined sewer flows during wet weather events, reducing the number of combined sewer discharges into the environment.

The contract envisages the construction of 6 shafts of varying diameters and depths, connections between the tunnel and the shafts, and a series of concrete structures for the collection and transporting of wastewater and rainwater.

The project includes construction of the following elements:

  • 14,840 linear feet of 24-foot diameter tunnel
  • Six deep shafts
  • Adit connections between shafts and tunnel
  • Concrete Structures for the collection and transporting of wastewater and rainwater
  • Site/civil restoration
  • Modifications to existing regulatory structures

 

The Lane Construction Corporation

Corporate Office

90 Fieldstone Court
Cheshire, CT 06410

Phone (203) 235-3351
Fax (203) 237-4260

Search Lane

Connect with Lane

Twitter LinkedIn Youtube Facebook Instagram

Salini ImpregiloThe Lane Construction Corporation is a wholly owned subsidiary of Lane Industries, Inc., which is a wholly owned subsidiary of Salini Impregilo U.S. Holdings, Inc.

© 2019 The Lane Construction Corporation. All Rights Reserved. Lane is an Equal Opportunity Employer M/F/D/V.